Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 15 PSI TEST FROM METER UNDERGROUND UP AT BUILDING OVERHEAD TO FURNACE AND CAPPED AT WATER HEATER LOCATION. GAS CARD AT METER. 1. ELECTRIC WATER HEATER IS INSTALLED WITHOUT PERMITS AND SHALL REQUIRE CORRECT WIRING. THIS SHALL REQUIRE FLEX CONDUIT FROM WALL TO APPLIANCE. 2. WATER HEATER TEMPERATURE & PRESSURE RELIEF DRAIN PIPING SHALL BE GRAVITY DRAIN TO DAYLIGHT. THIS PIPING SHALL BE RIDGID FULL SIZE PIPING. 3. SECURE GAS PIPING IN FURNACE CLOSET. |