Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/19/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* | |
| 01/18/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE REQUIRED TEST GAGE ON LOW PRESSURE GAS SYSTEM IS LB MAX WITH 1/10 INCREMENTS 2. SHALL PROVIDE TAPE PRIMER ON ALL JOINTS UNDERGROUND AND THEN APPLY THE TAPE. 3. SHALL OBTAIN A APPEAL FORM FROM OUR OFFICE FOR ALTERNATE METHOD FOR T&P DRAIN |
|
| 01/13/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. ALL UNDERGROUND PIPING TO BE SCOTCH COATED, INCLUDING RISERS, 2. PIPE TO BE PRIMED, THEN TAPED AT ALL UNDERGROUND FITTINGS & TOOL MAKRS. 3. PROVIDE GAS ISOMETRIC DRAWING APPROVED BY CITY FOR ANY FUTURE CONNECTION (TEE OUTLET). 4. PROVIDE UPPER & LOWER COMBUSTION AIR MINIMUM 100 SQ. INCHES EACH FOR WATER HEATER. 5. PROVIDE GRAVITY DRAIN TO DAYLIGHT FOR WATER HEATER TEMPERATURE & PRESSURE RELIEF OR SIGNED BY CITY PETITION OF APPEAL FOR ALTERNATE FORM OF TEMPERATURE & PRESSURE RELIEF ON SITE WITH CORRECT INSTALLATION. 6. PROVIDE BONDING OF BUILDING GAS PIPING. |