Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/20/2006 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection :* 12 PSI TEST FROM METER UNDERGROUND TO BUILDING THRU EXISTING TO WATER HEATER & FURNACE NEW PIPING TO DRYER LOCATION - OK |
|
| 01/19/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PETITION OF APPEAL #2006.014 ON SITE 1. TEST SHALL HOLD MINIMUM PRESSURE WITH NO PRESSURE LOSS 2. PROVIDE WATERPROOF SEAL AT PENETRATIONS THRU ROOF FOR PIPING. |
|
| 01/18/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 01/13/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE CORRECT ITEMS #1, #4, #8 ITEM #8 REQUIRES FULL SIZE VENT ALL THE WAY IT CANNOT REDUCE FROM A LARGER SIZE TO A SMALLER SIZE ON THE ROOF. |
|
| 01/12/2006 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection :* | |
| 01/11/2006 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. IF YOU WISH TO HAVE FUTURE CONNECTIONS IN YOUR GAS PIPING SYSTEM YOU SHALL HAVE A CITY APPROVED ISOMETRIC PLAN SHOWING BTU REQUIREMENTS AT ALL LOCATIONS. 2. PROVIDE LOWER COMBUSTION AIR FOR FURNACE & WATER HEATER 3. PROVIDE CURRENT TRANSITION FITTIG FOR FURNACE 4" TO 5" VENT, WITH 3-GALV SCREWS AT ALL VENT JOINTS ON BOTH FURNACE AND WATER HEATER. 4. PROVIDE WORKING TEMPERATURE & PRESSURE RELIEF DEVICE WITH GRAVITY DRAIN TO DAYLIGHT SEPARATE FROM A/C CONDENSATE DRAIN. FOR WATER HEATER. 5. HOW WILL YOU SERVICE YOUR WATER HEATER WHEN IT NEEDS REPLACEMENT? 6. PROVIDE BONDING OF BUILDING GAS PIPING 7. PRIME & TAPE ALL TOOL MARKS AND FITTINGS ON UNDERGROUND GAS PIPING. 8. PROVIDE APPROVED DOUBLE WALL VENT TERMINATION MINIMUM 3' ABOVE - AIR INTAKES WITH APPROVED DOUBLE WALL VENT CAP |