Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* OK FOR GAS CALL SW GAS 889-1888 |
|
| 01/30/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 10 PSI TEST REQUIRED. GAUGE MUST HAVE 1/10 TH PSI INCREMENTATION AGA VALVES REQUIRED WATER HEATER IS REQUIRED TO BE PROTECTED BY A WEATHERPROOF ENCLOSURE T&P MUST TERMINTATE 6" ABOVE GROUND EXTERIOR FLUE PIPING IS REQUIRED TO BE DOUBLE WALL B VENT AND SHALL TERMINATE 1' ABOVE ANY VERTICAL SURFACE WITH A LISTED VENT CAP. DO NOT TAPE JOINTS AT SINGLE TO DOULBE WALL CONNECTIONS - USE LISTED FITTINGS. THREAD PROTECTORS ARE NOT ACCEPTED USE WEATHER RESISTANT PIPING SUPPORTS INSTALL NEW FLEXES AT APPLIANCE CONNECTIONS RECALL FOR INSPECTION WHEN READY |