Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 01/11/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 01/06/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 12 PSI TEST NOT HOLDING PRESSURE 2) PROVIDE MINIMUM 3 SCREWS IN ALL JOINTS OF VENT CONNECTORS 3) REMOVE TAPE 4) ALL CRIMPED ENDS TO GO WITH FLOW 5) GAS FLEX CANNOT PENETRATE THE FURNACE CABINET 6) PROVIDE A T & P RELIEF DRAIN SLOPED TO DAYLIGHT 7) PROVIDE APPROVED GAS SHUT OFF VALVES AT ALL APPLIANCES 8) BOND THE GAS PIPE WITH ELECTRIC PANEL 9) PROVIDE A MINIMUM 10 POUND PRESSURE TEST ON ENTIRE GAS SYSTEM |