Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SHOP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2006 | SIGN SHOP | Approved | IVRS - Inspection :* | |
| 11/02/2006 | SIGN SHOP | Partial Approval | IVRS - Inspection :* 1) FINISH PREVIOUS ITEMS #1, 4, 6 & 7 |
|
| 10/27/2006 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :* 1. TIGHTEN FITTINGS ALSO NEED REDUCING WASHER AND FITTINGS. 2. MAINTAIN GTO CLEARANCES TO GROUNDED SURFACES AND OTHER CABLES. ALSO GLASS TO SURFACE 1/4" 3. USE APPROVED GTO SPLICE COMPONENTS. 4. FILL OUT MARKING LABEL. 5. VERIFY WET LOCATION FOR POWER. 6. A LOCKOUT IS NEEDED FOR SWITCH 600.6 7. FINISH STRAPPING FLEX CONDUIT & MC CABLES 8. FILL UNUSED OPENING IN TRANFORMERS & LETTERS 9. DO NOT RE-ENERGIZE SIGN UNTIL FINALED BY ELECTRICAL INSPECTOR. |