Inspection History Details
Inspection Status: Approved
Inspection History: SIGN SHOP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/02/2007 | SIGN SHOP | Approved | IVRS - Inspection :* | |
| 12/21/2006 | SIGN SHOP | Not ready for Inspection | IVRS - Inspection :* 1. CANNOT EXIT THROUGH POLE HAND HOLE COVER 2. A MARKING LABEL IS NEEDED 3. CONNECT ALL GROUND CONDUCTORS 4. DO NOT ENERGIZE SIGN UNTIL FINALED BY ELECTRICAL INSPECTOR. |