Inspection History Details
Inspection Status: Approved
Inspection History: CERTIFICATE OF OCCUPANCY
Permit Number - T06OT01701
Inspection Description - CERTIFICATE OF OCCUPANCY
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/24/2006 | CERTIFICATE OF OCCUPANCY | Approved | IVRS - Inspection :* | |
08/23/2006 | CERTIFICATE OF OCCUPANCY | Not ready for Inspection | IVRS - Inspection :* | |
08/11/2006 | CERTIFICATE OF OCCUPANCY | Not ready for Inspection | IVRS - Inspection :* | |
06/30/2006 | CERTIFICATE OF OCCUPANCY | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SIGN AT FRONT ENTRANCE "THIS DOOR TO REMAIN UNLOCKED WHILE BUILDING IS OCCUPIED". 2. LISTED FITTINGS MUST BE USED LAVATORY DRAIN. 3. TEMPERATURE PRESSURE RELIEF DISCHARGE DRAIN REQUIRED ON WATER HEATER. 4. REAR PORCH LIGHT FIXTURE REQUIRES LEVER AND WEATHERPROOFING @ WALL. 5. SWITCH (LIGHT) BY FRONT DOOR APPEARS BROKEN. 6. PLAN SHOWS RESTROOM @ NORTHEAST CORNER THIS IS NOT THE CASE. YOU WILL NEED TO PROVIDE AN EXISTING FLOOR PLAN FOR WHAT IS HERE NOW OR GET PROPER PERMITS FOR RESTROOM, BREAKROOM & PARTITION WALL. |