Inspection History Details
Inspection Status: Approved
Inspection History: CERTIFICATE OF OCCUPANCY
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/04/2010 | CERTIFICATE OF OCCUPANCY | Approved | ||
| 07/28/2010 | CERTIFICATE OF OCCUPANCY | Partial Approval | IVRS - Inspection :* 1) SUPPORT ICE MAKER CONDENSATE LINES 2) REPAIR PLUMBING LEAKS ABOVE ICE MACHINE 3) PLUG HOLES IN ELECTRIC BOXES ABOVE ICE MACHINE AND TERMINATE OR REMOVE OLD FLEX CORRECTLY 4) REMOVE EXTENSION CORDS BY BAR SINKS AND TERMINATE OLD ELECTRIC WIRES AT CASH REGISTER CORRECTLY 5) ATTACHED BACKFLOW REPAIR RECEIPT |
|
| 04/18/2006 | CERTIFICATE OF OCCUPANCY | Partial Approval | IVRS - Inspection :* CHANGE PLAN TO SHOW UPSTAIRS SEATING (OLD STORAGE) (OCC LOAD STILL < 50) 1. CLEAR AISLE REQUIRED FOR REAR EXIT (TABLES IN AISLE) (44" CLEAR. REQUIRED) 2. PANIC HARDWARE REQUIRED AT GATE SW OUTSIDE 3. HANDRAIL REQUIRED BOTH SIDES OF STAIR. 4. ALL DRAINAGE INTO INDIRECT WASTE (FLOOR SINKS) MUST TERMINATE 1" ABOVE FLOOD RIM. 5. BACKFLOW PROTECTION REQUIRED AT CARBONATER IN SERVICE STATION (RPG) 6. PLUG RECEPTACLES REQUIRE COVERS; MOUNT REGISTER RECEPTACLE ON WALL OR PROVIDE WATERPROOF COVER. 7. BACKFLOW PROTECTION REQUIRED AT BAR CARBONATOR (RPG) 8. BACKFLOW PROTECTION (DCVA) OR LISTING INFORMATION REQUIRED FOR ICE MAKERS IN BASEMENT. 9. PROPERLY SUPPORT CONDENSATE DRAINS FROM ICE MAKERS. |