Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/30/2006 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 05/22/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PLEASE LOOK AT SINK/DISHWASHER SETUP IN S.W CORNER OF KITCHEN. 1. HAND SINK MAY NOT CONNECT TO 3 COMP SINK WHERE SINK DRAINS MUST USE DRAINAGE FITTINGS AND APPROVED INSTALLATION. 2. 3 COMP SINK TO USE APPROVED FITTINGS - FLOW CONTROL TO BE VENTED. 3. JANITOR SINK TO BE DIRECTLY CONNECTED TO SANITARY SEWER. 4. DISHWASHER DRAIN TO BE APPROVED FITTINGS INSTALLED IN APPROVED MANNER. 5. ALL FLOOR SINKS TO HAVE GRATED AND STRAINERS. 6. ALL PIPING TO BE IN ACCORDANCE WITH 2003 UPC 7. SINKS TO HAVE CLEANOUTS 8. WHEELED GAS APPLIANCES TO HAVE QUICK DISCONNECT AND RESTRAINTS. |
|
| 05/18/2006 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. 12" ADDRESS DISPLAY PER PIMA COUNTY STANDARD REQUIRED. 3" SUITE # REQUIRED. 2. ACCESSIBLE HARDWARE "NO KNOWLEDGE" REQUIRED AT RESTROOMS. DOOR MUST UNLOCK WHEN HANDLE TURNED. 3. ILLUMINATED EXIT SIGNS REQUIRED. 4. GATE MUST REMAIN UNLOCKED POST SIGN 5. ALL ELECTRIC COVERS MUST BE IN PLACE. 6. PLUMBING INSPECTOR WILL LOOK AT WASH STATION. 7. HAVE PLAN & PERMITS @ SITE "DOOR TO REMAIN UNLOCKED WHILE BUILDING OCCUPIED" |