Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/06/2007 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE OK TO BACKFILL TRENCH |
|
| 01/10/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSULATE ALL SIDES & TOP OF EXPOSED DUCT WORK IN FURNACE CLOSET. USE MIN. 1 1/2" FIBERGLASS INSULATION WITH VAPOR BARRIER. PLASTIC CONDUIT REQUIRES MIN. 18" BURIAL DEPTH. |
|
| 12/28/2006 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE PROTECTION AT REFER LINE PENETRATION THRU COIL CABINET 2) INSULATE BARE SHEET METAL ON FURNACE 3) EXPOSE ELECTRIC CONDUIT AND REFER LINES BURIED. PROVIDE TRACER WIRE FOR NON METALLIC CONDUIT. NEED TO SEE PROPER BURIAL DEPTCH |