Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2010 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* | |
| 01/12/2010 | MECHANICAL - FINAL | Partial Approval | IVRS - Inspection :* | |
| 01/11/2010 | MECHANICAL - FINAL | Cancelled | IVRS - RI canceled | |
| 07/31/2009 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CORRECTIONS HAVE NOT BEEN MADE 2) ID ALL CIRCUIT BREAKERS IN PANEL |
|
| 07/14/2009 | MECHANICAL - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) NO ACCESS TO ROOF |
|
| 08/15/2006 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - PROVIDE A SHEET METAL COVER OVER CANVAS CONNECTORS. - PROVIDE A ROOF JACK AT ELEC. PENETRATION THROUGH THE ROOF. - NEED TO SEE WHERE GAS PIPE IS CONNECTED. - BLOCK & CLAMP PVC EVERY 4' - HORIZONTAL SECTINO OF CONDENSATE DRAIN HAS NOT SLOPE. - MUST TERMINATE WITHIN 6" OF THE GROUND. - PAINT ALL PVC & FITTINGS WITH LATEX PAINT. - NEED TO SEE CIRCUIT BREAKER. - PROVIDE A PERMIT & INSPECTION FOR THE NEW WATER HEATER THAT WAS INSTALLED. |