Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/25/2008 | MECHANICAL - FINAL | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE |
|
| 01/23/2008 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* GAS VALVES INSTALLED IN WRONG PLACE MUST PRECEDE THE UNION RTU#2 CONDENSATE SLOPES UPHILL WRONG DIRECTION PROVIDE SAFE ACCESS TO ROOF HATCH |
|
| 12/06/2007 | MECHANICAL - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - PROVIDE 1" GAS PIPE TO FURNACES - SUPPORT HIGH VOLTAGE ELEC. CONDUIT - JUNCTION BOX NOT ACCESSIBLE & CANNOT LAY ON THE ROOF - SEAL PENETRATION IN ROOF CURB - RTU 2, 3 PROVIDE MORE SUPPORT UNDER CONDENSATE DRAIN LINES & CLAMP PIPE TO BLOCKS - DISCONNECTS ARE OVERFUSED - RTU 2 NUMBER ON UNIT DOES NOT MATCH NUMBER ON DISCONNECT - RECALL FOR FINAL |