Inspection Status: Correction Required
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date |
Description |
Inspector |
Results |
Comments |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.1 - replace missing electrical panel covers, east side equipment room, east and north walls |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.1 - secure electrical switch box to to building, east side of building, near trash compactor |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.1 - repair/replace light fixture so bulb is not hanging by power wire, small hallway from kitchen to lobby entrance of bar |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.4 - remove/replace multi-plug adapter with circuit-protected one, neon sign, southwest corner of bar |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.6 - cover open electrical junction box, tower, 2nd floor, northeast end, storage room |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.3 - remove storage to provide 3-foot clearance in front of entire width of electrical switch panels, laundry room |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.1 - repair/replace electrical conduit that has been crushed, outside boiler room, northeast corner |
| 12/28/2006 |
VIOL - BUILDING SVCS & SYSTEMS |
|
Correction Required |
605.3 - remove storage to provide 3-foot clearance in front of entire width of electrical switch panels, boiler room |