Inspection History Details
Inspection Status: Correction Required
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/15/2006 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | Extension cord through ceiling tile: TFC 605.5 Extension cords. ...Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors... ***Remove extension cord in kitchen and/or replace with approved permanent electrical power source. |
|
| 12/15/2006 | VIOL - BUILDING SVCS & SYSTEMS | Correction Required | Extension cords: TFC 605.5 Extension cords. Extension cords and flexible cords shall not be a substitute for permanent wiring. *** Replace extension cord in office with approved power strip. |