Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Case: T06FR02880

Parcel: 12710084B


Addresses:

6210 E SPEEDWAY BL

Inspection Status: Correction Required

Inspection History: VIOL - BUILDING SVCS & SYSTEMS

Date Description Inspector Results Comments
12/15/2006 VIOL - BUILDING SVCS & SYSTEMS Correction Required Extension cord through ceiling tile:
TFC 605.5 Extension cords. ...Extension cords and flexible cords shall not be affixed to structures, extended through walls, ceilings or floors...
***Remove extension cord in kitchen and/or replace with approved permanent electrical power source.
12/15/2006 VIOL - BUILDING SVCS & SYSTEMS Correction Required Extension cords:
TFC 605.5 Extension cords. Extension cords and flexible cords shall not be a substitute for permanent wiring.
*** Replace extension cord in office with approved power strip.