Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T06FR02812

Parcel: 13414001K

Inspection Status: Approved

Inspection History: VIOL - PRECAUTION AGAINST FIRE

Case Number - T06FR02812

Inspection Description - VIOL - PRECAUTION AGAINST FIRE

Inspection Status - Approved

Date Description Inspector Results Comments
01/12/2007 VIOL - PRECAUTION AGAINST FIRE Approved
12/01/2006 VIOL - PRECAUTION AGAINST FIRE Violation IFC 2003 315.2.1 Ceiling clearance.
Storage shall be maintained 2 feet (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings.
1. KEEP ALL STORAGE 18 INCHES BELOW SPRINKLER HEAD.