Inspection Status: Approved
Inspection History: INSP - AST/UST
| Date |
Description |
Inspector |
Results |
Comments |
| 12/18/2006 |
INSP - AST/UST |
|
Approved |
ESO has been changed so that it cannot be reset at the button, must be manually reset at the electrical panel. Passed. |
| 12/14/2006 |
INSP - AST/UST |
|
Correction Required |
Final not ready due to ESO can be reset at switch. All other checks are OK, will need to call in for another inspection. |
| 12/07/2006 |
INSP - AST/UST |
|
Approved |
Secondary piping inspection passed. |
| 12/05/2006 |
INSP - AST/UST |
|
Approved |
Primary piping inspection and vapor recovery line passed. |
| 11/28/2006 |
INSP - AST/UST |
|
Continued |
met with Will Hunter to look at current E-stop location. I will be requiring them to add a second location to the north of the dispensers. |