Inspection Status: Approved
Inspection History: INSP - AST/UST
| Date |
Description |
Inspector |
Results |
Comments |
| 02/07/2007 |
INSP - AST/UST |
|
Approved |
Final inspection passed |
| 12/27/2006 |
INSP - AST/UST |
|
Compliance |
Primary and secondary piping passed. Dispenser sumps passes leak test. |
| 12/22/2006 |
INSP - AST/UST |
|
Correction Required |
Piping inspection failed, secondary guages were inop. Vent pipes failed bubble test. Primary pipe passed. |
| 12/21/2006 |
INSP - AST/UST |
|
Correction Required |
Piping inspection failed, secondary will not hold pressure. Informed Dan of placement for bollards. |
| 11/28/2006 |
INSP - AST/UST |
|
Continued |
inspected excavation, fabric in place, 12" bed of pea gravel down prior to tanks being set (2 x 20000 gal). Tanks arrived on vacuum, will check after backfilled. |
| 11/21/2006 |
INSP - AST/UST |
|
Continued |
met with Marty Wildman (A & H Contracting Services), Dan Froyland (Triumph Builders) to discuss project. Tanks to be set on the 28th at 0800 hrs. |