Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/26/2006 | VIOL - BUILDING SVCS & SYSTEMS | Approved | ||
| 05/08/2006 | VIOL - BUILDING SVCS & SYSTEMS | Violation | Electrical service box clearance: TFC 605.3 Working space and clearance. A working space of not less than 30 inches (762 mm) in width, 36 inches (914 mm) in depth and 78 inches (1981 mm) in height shall be provided in front of electrical service equipment. ***Clear area in fromt of electrical box. Re-inspection scheduled for 5/23/06. Done 6/26/06. |