Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T06FR01217

Parcel: 11445262J

Inspection Status: Approved

Inspection History: VIOL - PRECAUTION AGAINST FIRE

Case Number - T06FR01217

Inspection Description - VIOL - PRECAUTION AGAINST FIRE

Inspection Status - Approved

Date Description Inspector Results Comments
05/24/2006 VIOL - PRECAUTION AGAINST FIRE Approved
05/08/2006 VIOL - PRECAUTION AGAINST FIRE Violation Boxes piled to ceiling:
TFC 315.2.1 Ceiling clearance. Storage shall be maintained 24 inches (610 mm) or more below the ceiling in nonsprinklered areas of buildings or a minimum of 18 inches (457 mm) below sprinkler head deflectors in sprinklered areas of buildings.
***Remove storage to at least 18" below sprinkler heads.