Inspection History Details
Inspection Status: Approved
Inspection History: VIOL - BUILDING SVCS & SYSTEMS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/15/2006 | VIOL - BUILDING SVCS & SYSTEMS | Approved | All abated as of 5/15/06. Thank you! | |
| 04/17/2006 | VIOL - BUILDING SVCS & SYSTEMS | Violation | Electrical: Fan and Panel: TFC 605.1 Abatement of electrical hazards. Identified electrical hazards shall be abated. ***Repair bathroom fan. TFC 605.3 Working space and clearance. A working space of not less than 30 inches (762 mm) in width, 36 inches (914 mm) in depth and 78 inches (1981 mm) in height shall be provided in front of electrical service equipment. ***Clear area around access panels in an approved manner. Re-inspection scheduled for 4/27/06. |