Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/16/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 02/13/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 02/12/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. MAIN WATER BOND CLAMP IS LOOSE AND HAS COMPRESSED COPPER WATER PIPE. 2. PROVIDE ACCESS TO UNITS FOR PANEL AND BONDING CONNECTIONS. |
|
| 02/08/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) BOND MAST-NEC 250.92 AND NEC 250.102 2) BOND FOR GAS AND WATER UNDERSIZED-NEC 250.104 A1 3) IDENTIFY SERVICE DISCONNECTS, ADDRESS AND UNIT NUMBERS 4) INSTALL FLASHING FOR MAST CHECK NEUTRALS/GROUND IN SUB-PANEL |