Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/29/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 10/26/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 09/26/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. OPEN AND EXPOSE ALL NEW WIRING AND BOXES 2. PLEASE VERIFY PERMITS FOR FRAMING NEW TO ENCLOSE 3. DERATE CONDUCTORS PER 310.15 4. CLEAN SURFACE UNDERGROUND BAR 250.12 5. SECURE CABLES TO JUNCTION BOX 312.5 6. TERMINATE CONDUCTORS UNDER TERMINAL LUGS. 7. VERIFY BOX FILL. |
|
| 09/20/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. A PERMIT FOR NEW WORK TO INTERIOR IS NEEDED. 2. CONDUCTORS TO EXTEND 24" PAST WEATHERHEAD PER TEP 3. PROVIDE ADEQUATE SUPPORT FOR RISER GUY BACK. 4. LABEL BREAKERS 5. GAS AND WATER BONDS NEEDED 6. NO CIRCUITS IN PANEL AT THIS TIME. |