Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* 1) SERVICE ONLY NEEDS TO BE SEALED |
|
| 10/23/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CALL TO RESCHEDULE INSPECTION WITH RICK H. |
|
| 09/25/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* FINISH PREVIOUS ITEMS. |
|
| 09/21/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. GROUNDING ELECTRODE CONDUCTOR IN METAL RACEWAY TO BE BONDED AS PER 250.64 2. PLEASE UNCOVER GROUND RODS TO INSPECT CONNECTIONS. 3. BREAKERS TO BE LISTED FOR USE BY MANUFACTURER 4. WE HAVE EXTREME CORROSION ON MAIN BUSS 5. PLEASE VERIFY WATER BONDING 6. CANNOT TRIM CONDUCTORS 7. SUB-PANEL FEED IS A 2-WIRE SYSTEM NO GROUND. 8. NEED TO SEE CONNECTIONS TO INTERIOR SUB-PANEL UNIT "A" |
|
| 09/19/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* LOCKED NO ACCESS |