Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06EL01721
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/04/2010 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
08/30/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. STILL NEED TO SECURE G.E.C & BOND WIRE TO STRUCTURE 2. PANEL DIRECTORY NOT LEGIBLE OR CORRECTLY IDENTIFIED SHOULD SAY CLEARLY WHAT BREAKER SERVES I.E PORCH LIGHT NOTE: SECURE CONDUCTORS TO STRUCTURE SO THEY CAN'T BE PULLED AWAY AND USE STRAPS LISTED FOR #4 CU REFEE WILL BE CHARGED IF NOT CORRECT NEXT INSPECTION |
|
08/28/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. SECURE GAS BOND CONDUCTOR TO STRUCTURE. 2. SECURE AND OR BURY GROUNDING ELECTRODE CONDUCTOR. 3. TIGHTEN ALL ACORN/BOND CLAMPS 4. IDENTIFY WHITE CONDUCTOR USED AS HOT 5. PROVIDE PERMIT FOR ANY ADDED CKT'S - A.C? 6. NEED SEALING TYPE LOCKNUT FOR CONDUIT ENTRY ABOVE LIVE PARTS. 7. DO A BETTER JOB ON PANEL DIRECTORY -- WHAT IS "LT?" WHAT IS "RECP"? |