Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06EL01559
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/15/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 09/07/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. BOND NEUTRAL TO SERVICE DISCONNECT ENCLOSURE 2. IDENTIFY SERVICE DISCONNECT 3. NEED UNIT # ON METER & UNITS 4. BOND SERVICE NIPPLES 5. MINIMUM SIZE SERVICE TO UNIT IS 60 AMPS. |
|
| 08/09/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. SERVICE IS LISTED FOR OVERHEAD ENTRY ONLY -- NEC 110.3 2. SERVICE DISCONNECT IS MOUNTED TO HIGH 3. GROUNDING ELECTRODE CONDUCTOR NEEDS TO BE BONDED TO SERVICE DISCONNECT ENCLOSURE. 4. NEUTRALS & EQUIPMENT GROUNDS NEED TO BE CORRECTLY IDENTIFIED 5. EXPOSE UNDER GROUND 6. INSTALL CORRECT UNIT NUMBER (PER PERMIT) ON SERVICE AND UNIT. 7. SERVICE GUTTER TO BE RAINTIGHT. 8. GROUND ALL METAL J-BOXES *NOTE: CHECK PERMIT ACTIVITY 9. HAVE OVERFILLED J-BOX, COVERS MISSING WIRING NOT COMPLETE. |