Inspection History Details
Inspection Status: Denied
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/08/2007 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED MINIMUM #3 EQUIPMENT GROUND FOR 400AMP CKT NEC 250.122 2. NEUTRALS & GROUNDS TO BE SEPARATED IN PANELS "A" "B" "C" - NEC 250.32 3. FINISH ALL WIRING PER PLAN |
|
| 08/14/2007 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | IVRS - Inspection :* REVISE PLANS TO SHOW ACTUAL SCOPE OF WORK THEN CALL FOR INSPECTION |
|
| 08/06/2007 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : NEED PLANS AND ELECTRICIAN ON SITE FOR INSPECTION |
|
| 08/02/2007 | ELECTRIC - SERVICE UPGRADE | Not ready for Inspection | IVRS - Inspection :* | |
| 08/03/2006 | ELECTRIC - SERVICE UPGRADE | Partial Approval | 1) Install bonding bushings on the nipple between the service and meter. Typical for M1, M2, M3. DONE 8/04/06 2) Install a 1/0 grding elec conductor per plans.Typical of M1,M2, M3 DONE 08/04/06 3) Address the services. Typical of M1,M2, M3. DONE 08/08/06 4) Panel B requires MB. 5) Plan indicates the main fuses for disconnects M1,M2, M3 should be LPNRK, FRNR fuses are installed. |