Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/17/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* 1) NOTE: STRAP GROUND WIRE BELOW SERVICE TO WALL ALSO WIRE BELOW WATER BOND TO PREVENT PULLING OUT |
|
| 07/18/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* COMPLETE CORRECTIONS. |
|
| 07/14/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* WILL RESCHEDULE |
|
| 06/14/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. SERVICE DROP NEEDS MINIMUM 10' CLEARANCE FROM GROUND OVER PROPERTY. 2. PROVIDE ADDITIONAL SUPPORT FOR MAST (GUY KIT) 3. USE HEAVIER HARDWARE FOR MAST STRAPS. 4. MAST NEEDS TO BE BONDED. 5. SERVICE ENTRANCE CONDUCTORS NEED TO LAND ALL THE WAY IN THE LUGS. 6. USE JOINT INHIBITOR ON ALL ALUMINUM TERMINATIONS. 7. BOND WATER PIPE TO SERVICE. 8. CONDUCTORS ENTERING PANEL NEED BUSHING OR CONNECTOR. 9. HAVE TO HIGH OVERCURRENT FOR BRANCH CKTS. 10. IDENTIFY PANEL DIRECTORY. 11. INSTALL BLANK OVER OPEN BREAKER SPACE. |