Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/22/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/20/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
| 10/09/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* SERVICE INSPECTION ONLY 1. PROPERLY TERMINATE SERVICE CONDUCTORS IN SERVICE DISCONNECT. 2. ROUTE GROUNDING ELECTRODE CONDUCTOR TO SERVICE DISCONNECT ENCLOSURE AND TERMINATE ON NEUTRAL BLOCK. 3. REMOVE GROUND JUMPERS BETWEEN SECTIONS SO YOU CAN PROPERLY TERMINATE EQUIPMENT GROUNDS. 4. INSTALL BREAKER BLANKS AS NEEDED. 5. REMOVE BONDING SCREWS FROM ALL SUB-PANELS. 6. IDENTIFY (BETTER) SERVICE NEUTRALS (OUT OF W.HEADS) 7. HAVE AN APPROVED SET OF PLANS ON SITE AND CHECK CALCULATIONS FOR SERVICE SIZE. IT (THE CALC'S) DO NOT APPEAR TO BE CORRECT. 8. HAVE ALL EQUIPMENT OPEN FOR INSPECTION. |