Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06EL00886
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/26/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
05/24/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1) CHIME TRANSFORMER NEEDS TO BE SEPERATED FROM POWER CRICKETS IN J-BOX, PROVIDE BARRIER OR SEPERATE ENCLOSURE NEC 725 2) WHAT ARE BARE CONDUCTORS ENTERING BACK OF J-BOX WIRED TO EQUIPMENT GROUND ? THEY APPEAR TO BE HOT OR NEUTRALS, WIRE ACCORDINGLY |