Permit: T06EL00837

Parcel: 11515135A


Addresses:

637 W GRANT RD


Inspection Status: Partial Approval

Inspection History: ELECTRIC - FINAL

Permit Number - T06EL00837

Inspection Description - ELECTRIC - FINAL

Inspection Status - Partial Approval

Date Description Inspector Results Comments
11/03/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
OK ELECTRICAL FINAL PENDING APPROVAL OF MACHINERY
LISTING/TESTING BY 3RD PARTY AGENCY.
11/02/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
1) 9;30 AM-GATE LOCKED AND NO CONTRACTOR
2) GAVE 1 HR CALL-WILL NEED TO RESCHEDULE
10/18/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
ON BACK DOOR
1. IDENTIFY MAIN DISCONNECT AND WHAT IT FEEDS
2. GROUND J-BOX BELOW DISCONNECT AND MAKE RAIN TIGHT
3. SEAL TITE FLEX NOT ALLOWED AS RACEWAY - NEC 350.12
4. 2 STRANDED CONDUCTORS UNDER SAME TERMINATION NOT ALLOWED
5. WELDER CORD NOT TO PASS THROUGH WALL
6. USE EQUIPMENT GROUND TO GROUND ALL J-BOXES
7. IDENTIFY ALL DISCONNECTS
8. STRAP ALL FLEX PER NEC 350.30
9. CLEARLY AND CORRECTLY IDENTIFY PANEL DIRECTORY
10. ALL MACHINERY TO BE LISTED AND LABELED
11. PROVIDE ROOF ACCESS

EAST DOCK -- SECURE MOTOR IN PLACE
STRAP FLEX
IDENTIFY CKTS IN PANEL
10/16/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
WILL RESCHEDULE AND HAVE PLANS
06/28/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NEED TO PROVIDE SET OF PLANS THAT ARE APPROVED AND INCLUDE SERVICE CALCULATIONS AND INTERIOR WIRING. INCLUDE WIRING FOR ALL EQUIPMENT AND INCLUDE IN CALCULATIONS
05/23/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
05/16/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
The service is not per code.| 210*
1. SERVICE MAST NOT BONDED (MYERS HUB NOT LISTED) NEC 250.92
2. METER & METER NIPPLE NEED TO BE BONDED - NEC 250.92
3. INSTALL ADDRESS ON SERVICE.
4. METAL RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR NEEDS TO BE MADE ELECTRICALLY CONTINUOUS ON BOTH ENDS NEC 250.64 (E)
5. BOND TO CT ENCLOSURE IS UNDERSIZED - NEC 250.102
6. BONDING CONDUCTORS IN GUTTER AND DISCONNECTS WILL HAVE OBJECTIONABLE CURRENT WHEN ENERGIZED
NEC 250.102
7. MAIN BONDING JUMPER IS UNDERSIZED - NEC 250.28 (D)
8. INSTALL SERVICE FUSES - NEC 310
9. IDENTIFY ALL SERVICE DISCONNECTS - NEC 230.70 (B)
10. NEED BUSHING FOR #4 AND LARGER CONDUCTOR -
NEC 300.4 (F)
11. TERMINATE ALL FEEDERS AND FLOAT NEUTRALS AND GROUNDS IN ALL SUB-PANELS
*NOTE: PARTIAL INSPECTION ONLY - HAVE PLANS ON SITE AND ALL EQUIPMENT OPEN FOR INSPECTION.