Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - FINAL
Permit Number - T06EL00837
Inspection Description - ELECTRIC - FINAL
Inspection Status - Partial Approval
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/03/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK ELECTRICAL FINAL PENDING APPROVAL OF MACHINERY LISTING/TESTING BY 3RD PARTY AGENCY. |
|
11/02/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) 9;30 AM-GATE LOCKED AND NO CONTRACTOR 2) GAVE 1 HR CALL-WILL NEED TO RESCHEDULE |
|
10/18/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* ON BACK DOOR 1. IDENTIFY MAIN DISCONNECT AND WHAT IT FEEDS 2. GROUND J-BOX BELOW DISCONNECT AND MAKE RAIN TIGHT 3. SEAL TITE FLEX NOT ALLOWED AS RACEWAY - NEC 350.12 4. 2 STRANDED CONDUCTORS UNDER SAME TERMINATION NOT ALLOWED 5. WELDER CORD NOT TO PASS THROUGH WALL 6. USE EQUIPMENT GROUND TO GROUND ALL J-BOXES 7. IDENTIFY ALL DISCONNECTS 8. STRAP ALL FLEX PER NEC 350.30 9. CLEARLY AND CORRECTLY IDENTIFY PANEL DIRECTORY 10. ALL MACHINERY TO BE LISTED AND LABELED 11. PROVIDE ROOF ACCESS EAST DOCK -- SECURE MOTOR IN PLACE STRAP FLEX IDENTIFY CKTS IN PANEL |
|
10/16/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* WILL RESCHEDULE AND HAVE PLANS |
|
06/28/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NEED TO PROVIDE SET OF PLANS THAT ARE APPROVED AND INCLUDE SERVICE CALCULATIONS AND INTERIOR WIRING. INCLUDE WIRING FOR ALL EQUIPMENT AND INCLUDE IN CALCULATIONS |
|
05/23/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
05/16/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The service is not per code.| 210* 1. SERVICE MAST NOT BONDED (MYERS HUB NOT LISTED) NEC 250.92 2. METER & METER NIPPLE NEED TO BE BONDED - NEC 250.92 3. INSTALL ADDRESS ON SERVICE. 4. METAL RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR NEEDS TO BE MADE ELECTRICALLY CONTINUOUS ON BOTH ENDS NEC 250.64 (E) 5. BOND TO CT ENCLOSURE IS UNDERSIZED - NEC 250.102 6. BONDING CONDUCTORS IN GUTTER AND DISCONNECTS WILL HAVE OBJECTIONABLE CURRENT WHEN ENERGIZED NEC 250.102 7. MAIN BONDING JUMPER IS UNDERSIZED - NEC 250.28 (D) 8. INSTALL SERVICE FUSES - NEC 310 9. IDENTIFY ALL SERVICE DISCONNECTS - NEC 230.70 (B) 10. NEED BUSHING FOR #4 AND LARGER CONDUCTOR - NEC 300.4 (F) 11. TERMINATE ALL FEEDERS AND FLOAT NEUTRALS AND GROUNDS IN ALL SUB-PANELS *NOTE: PARTIAL INSPECTION ONLY - HAVE PLANS ON SITE AND ALL EQUIPMENT OPEN FOR INSPECTION. |