Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06EL00614
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/19/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
05/12/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* SEE NOTE #2 LAST INSP. |
|
05/10/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. CONDUIT PULLED OUT OF COUPLING UNDER PANEL. 2. RELOCATE SERVICE PANEL OR WATER FAUCET UNDER SERVICE - AREA MUST BE CLEAR DEDICATED SPACE PER 110-26 NEC |
|
05/05/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* 1. BUILDING IS LOCKED, LEFT MESSAGE @ 312-9114 TO RESCHEDULE. |
|
04/04/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The service is not per code.| 210* 1. IDENTIFY PANEL DIRECTORY 2. SERVICE CONDUCTORS ARE UNDERSIZED 3. ACORNS, BOND CLAMPS AND PIPE FITTINGS ARE LOOSE 4. SECURE BOND WIRE TO STRUCTURE ON ROOF 5. SERVICE HAS WATER PIPE THAT OBSTRUCTS ENTRY 6. BRANCH CKTS THAT HAVE SHARED NEUTRAL NEED TO BE ON SEPARATE PHASES 7. CONDUCTORS ENTERING REAR OF PANEL NEED TO BE IN RACEWAY. 8. WATER AND GAS BOND WIRE TO BE SIZED PER NEC 250.104 (A)(1) |