Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2006 | ELECTRIC - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 06/27/2006 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 06/09/2006 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. INSTALL LIGHTING OUTLET NEEDED IN PANEL ROOM. 2. INSTALL HARD WIRED SMOKE DETECTORS IN BEDROOM AND OUTSIDE BEDROOM. OK TO DRYWALL/PATCH AFTER CORRECTIONS. 3. INSTALL PROPER CONNECTOR FOR PANEL RACEWAY. 4. GROUND ALL METAL BOXES. |
|
| 06/02/2006 | ELECTRIC - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 05/31/2006 | ELECTRIC - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 04/24/2006 | ELECTRIC - INTERMEDIATE | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* AT SERVICE: 1. SERVICE GUTTER AND MAST NEED TO BE BONDED NEC 250.92 2. SERVICE CONDUCTORS AND BRANCH CKT CONDUCTORS NOT ALLOWED IN SAME RACEWAY/GUTTER NEC 230.7 3. NEED BUSHING FOR #4 AND LARGER WIRE NEC 300.4(F) 4. IDENTIFY SERVICE DISCONNECT AND THE LOAD IT SERVES NEC 230.70 B 5. BOND NEUTRAL TO ENCLOSURE NEC 250.24(B) 6. NEED EQUIPMENT GROUND FOR FEEDER NEC 250.32 (B)(U) 7. TRENCH FOR FEEDER TO GUEST HOUSE NEEDS TO MEET REQUIREMENTS OF NEC 300.5(A) AT GUEST HOUSE: 1. HAVE OVERFILLED BOXES NEC 314.16 2. NEED MINIMUM 6" OF CONDUCTORS IN BOXES NEC 300.14 3. USE PROPER TOOL FOR CRIMP SLEEVES AND TIGHTEN WIRE NUTS NEC 110.0 4. ALL METAL BOXES NEED TO BE GROUNDED PROPERLY NEC 314.4 5. INSTALL NAIL PLATE AND PROTECT OPEN ROMEX NEC 334 NEED QUALIFIED ELECTRICIAN INSPECTION NOT COMPLETE - WILL CONTINUE |