Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - SERVICE UPGRADE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2006 | ELECTRIC - SERVICE UPGRADE | Approved | IVRS - Inspection :* | |
| 03/27/2006 | ELECTRIC - SERVICE UPGRADE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED THE RESPONSIBLE PARTY TO OBTAIN PERMITS FOR ALL NEW WIRING ON THE INTERIOR. 2. INSTALL IN USE COVER AT GFCI RECEPTACLE BELOW PANEL 3. INSTALL METAL ADDRESS TAG PER TEP & I.R.C 4. INSTALL LOCKNUT AT PANEL - LB CONNECTION BELOW PANEL 5. INSTALL PROPER COLORS OF EQUIP. GROUNDING CONDUCTORS & NEUTRAL CONDUCTORS TAPE ONLY ALLOWED AS CABLE ASSEMBLY OR CONDUCTORS LARGER THAN #6 (#4 & LARGER OK TO TAPE) 6. ELECTRICAL IS NOT COMPLETE AT THIS TIME. 7. WIRES TO BE SIZED PER ART. 310.15 B2(A) ADJUSTMENT TABLES. 8. NEED PLUMBING & MECH. PERMITS W/PLANS (SEE #1 FOR ELECTRICAL) LOAD CALCULATIONS, CITY APPROVED PLANS PANEL SCHEDULES, ETC. 9. COVERS MISSING THROUGHOUT. |