Inspection History Details
Inspection Status: Partial Approval
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/02/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) BOND BUILDING STEEL AND WATER PER TABLE 250.66 2) NOTE: MYERS HUB NOT APPROVED FOR SERVICE |
|
| 04/14/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no plan or job inspection card on site.| 925* 1. NEED PLANS (APPROVED) FOR NEW SERVICE. 2. SERVICE CONDUCTORS ARE UNDERSIZED NEC 310.16 3. MAIN BONDING JUMPER UNDERSIZED NEC 250.28 (D) 4. LUG NOT LISTED FOR MULTIPLE/DIFFERENT SIZE CONDUCTORS AT GROUNDED TERMINATION NEC 110 5. ALL METALLIC PIPING TO BE BONDED TO SERVICE NEC 250.28 (D) 6. YOU HAVE A PARALLEL PATH ON NEUTRAL FROM DISCONNECTS TO CT CAN NEC 250.6 INSPECTIONS TO CONTINUE AFTER PLANS ARE FINISHED. |
|
| 03/28/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. NEED A PLAN FOR NEW WORK INCLUDING PANELS AND BRANCH CIRCUITS. 2. ID PANELS & MAIN DISCONNECTS, ADDRESS LABEL 3. CONDUITS FROM CT CAN TO DISCONNECT TO BE SUPPORTED. 4. SINCE BUILDING IS STEEL - NEEDS TO BE GROUNDED TO SERVICE. 5. GROUND RODS LEFT ABOVE GRADE (TRIP HAZARD) 6. CT CAN NEEDS A MAIN BONDING JUMPER TO UFER 7. INSTALL FUSING. |