Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 05/28/2008 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* NO ADDRESS POSTED!!! 1. AT WATER CLOSET - FLUSH HANDLE TO BE ON THE WIDE SIDE - BOWL TO BE HANDICAPPED 2. URINAL OVERFLOW TO BE NO HIGHER THAN 17" AFF FROM TOP OF URINAL TO CRITICAL LEVEL TO BE A MINIMUM OF 6" 3. ALL DRAINAGE PIPING TO HAVE A SMOOTH INTERIOR WATER WAY 4. REQUIRE 15" FROM SIDE WALL TO CENTER OF URINAL 5. WE REQUIRE A MINIMUM OF 3 CLIPS ON FRONT AND BACK OF SINK AND 2 CLIPS ON EACH SIDE 6. DISHWASHER DRAIN HOSE TO BE SECURED WITHIN 2" OF DRAIN BOARD HEIGHT 7. ICE MAKER REQUIRES HAMMER ARRESTOR - URINAL REQUIRES A HAMMER ARRESTOR CONTINUED "NOT READY" WILL RESULT IN A REINSPECTION FEE |