Permit: T06CM06508

Parcel: 105102410

Inspection Status: Approved

Inspection History: ELECTRIC - INTERMEDIATE

Permit Number - T06CM06508

Inspection Description - ELECTRIC - INTERMEDIATE

Inspection Status - Approved

Date Description Inspector Results Comments
04/05/2007 ELECTRIC - INTERMEDIATE Approved IVRS - Inspection :*
04/04/2007 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
03/29/2007 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1. REMOVE UNUSED RACEWAYS/BOXES
2. SEAL UNUSED OPENINGS
3. MC TO BE SECURED WITHIN 12" OF TERMINATIONS
4. CHECK BOX FILL, GROUND ALL BOXES
5. PROPERLY SUPPORT MC, INDIVIDUAL SUPPORT WIRES TO BE SECURED @ BOTH ENDS.
03/28/2007 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK BACK AREA WALL/HARD LID COVER
03/27/2007 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. PROVIDE BACK SUPPORT FOR BOXES
2. IDENTIFY WHITE USED AS HOT

NOTE: DO NOT COVER ANY ELECTRICAL BEFORE APPROVAL ANYTHING COVERED PRIOR TO APPROVAL NEEDS TO BE UNCOVERED.
03/02/2007 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
FINISH BACK SIDE WHIP SUPPORTS
LEAVE OFFICE TILES OPEN FOR LAST FIXTURE
03/01/2007 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection :*
OK TO COVER PHASE 1 - RMS 101 & 102