Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/12/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* PLUMBING FINAL OK OK FOR C OF O S.T.O.I |
|
| 06/07/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE CORRECT DRAINAGE FITTINGS & COUPLINGS FOR 3-COMP SINK WITH CORRECT FLOW CONTROL & VENT FITTINGS NOTE: SANITIZE INDIRECT DRAIN WILL BE REQUIRED TO BE 6" ABOVE FLOOR LEVEL BY HEALTH DEPT. 2. ALL INDIRECT DRAINS SHALL HAVE 1" AIR GAP 3. MAKE ALL FIXTURES WATER TIGHT 4. (2) SINKS DRAINAGE SHALL ONLY HAVE (1) SUP JOINT CONNECTION DOWNSTREAM OF J-BOND CONNECTION 5. PROVIDE VACUUM BREAKERS ON ALL HOSE BIBS 6. WATER HEATER TO BE INSTALLED PER DETAIL 204 PAGE P-3 AND HAVE PIPING PROPERLY INSULATED WITH EXPANSION TANK SECURED. 7. SECURE TEMPERING VALVES AT ALL LAV'S |