Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/27/2007 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* OK TO COVER ALL AREAS |
|
| 04/25/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. PLAN SHOWS 1" CW TO TEE AT WASHER BOX 2. OK TO COVER ALL AREAS |
|
| 04/24/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* UNABLE TO ACCESS MESSAGE -- IVR DOWN DOOR LOCKED NO ACCESS 1. PROVIDE FIGURES FOR AIR CHAMBERS AND FRAME FOR ACCESS PANEL. 2. WASHER BOX DAMAGED DURING CONST. INSTALL NEW BOX |
|
| 04/23/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | ALL STUB OUTS ARE TO BE SUPPORTED CONTINUED "NOT READYS" WILL RESULT IN A REINSPECTION FEE |
|
| 04/20/2007 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. SEE NOTE #3 FROM 04/13/07 2. CLOSET FLANGES SHALL BE SCREWED TO THE FLOOR WITH APPROVED MATERIALS. |
|
| 04/13/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. NOT INSTALLED PER PLAN 2. NO REDLINES ON SITE 3. SUPPORT ALL PIPE AT EACH CHANGE OF DIRECTION OR ELEVATION AND AT THE END OF BRANCHES, THEN NO MORE THAN 4' BETWEEN HANGERS FOR ABS NOR MORE THAN 3" FOR CPVC 4. ALL HOT AND RECIRC. TO BE INSULATED 5. NEED TO SEE CLOSET FLANGES 6. ALL WORK TO BE INSTALLED IN A WORKMANSHIP LIKE MANNER PLUMB, SQUARE, AND IN PRACTICAL ALIGNMENT. |