Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CONSTRUCTION POWER
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2007 | ELECTRIC - CONSTRUCTION POWER | Approved | IVRS - Inspection :* | |
| 04/23/2007 | ELECTRIC - CONSTRUCTION POWER | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* |
|
| 04/18/2007 | ELECTRIC - CONSTRUCTION POWER | Not ready for Inspection | IVRS - Inspection :* | |
| 03/23/2007 | ELECTRIC - CONSTRUCTION POWER | Denied | 1. REMOVE UNNEEDED BOND WIRE FROM DISCONNECT IT IS ALREADY BONDED BY NEUTRAL - NEC 250.6 2. GROUNDING ELECTRODE CONDUCTOR TO SERVICE HAS BEEN STOLEN. 3. USE OXIDATION INHIBITOR ON ALL ALUMINUM TERMINATIONS. 4. FEEDER GOING INTO TEMP PANEL TO BE PROTECTED FROM PHYSICAL DAMAGE AND WEATHER - SLEEVE IN NON-METALLIC SEAL TITE FLEX WOULD BE OK. |