Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/12/2007 | ELECTRIC - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 07/10/2007 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1. GROUNDING ELECTRODE CONDUCTORS TO BE RE-ROUTED 2. IDENTIFY PANEL XR DISCONNECT OK CEILING TILES X-RAY ROOM |
|
| 07/03/2007 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* INSPECTION FOR X-RAY ROOM CEILING 1. CONDUCTOR #4 & LARGER NEED PROTECTIVE BUSHING NEC 300.4F 2. IDENTIFY DISCONNECTS -- NEC 110.22 3. #8 GROUNDING ELECTRODE CONDUCTOR TO BE IN RACEWAY -- NEC 250.64B 4. PLANS SHOW A NEUTRAL FOR LOAD SIDE OF 7.5 KVA TRANSFORMER TO PANEL. ALSO, SHOWS 40 AMP LOAD SIDE, YOU HAVE 30 AMP FUSES. 5. NEED HOLDDOWN KIT FOR BACK FED MAIN BREAKER PANEL XR -- NEC 408.12 6. USE PROPER SIZE WATER BOND CLAMP FOR G.E.C NEC 110.3B 7. PROPERLY SUPPORT MC -- NEC 330.30 8. SECURE SOUTH FIXTURE TO GRID -- NEC 300.11 |
|
| 07/02/2007 | ELECTRIC - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* WIRING NOT COMPLETE CALL WHEN READY |
|
| 06/29/2007 | ELECTRIC - ABOVE CEILING | Not ready for Inspection | IVRS - Inspection :* | |
| 06/15/2007 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* 1) OK CEILING COVER MAIN AREA (REMOVE TEMP WIREING) 2) OK RADIOLOGY ROOM WALLS (INSTALL NAIL PLATES) 3) NEED APPROVED PLANS FOR RADIOLOGY ROOM 4) DO NOT ENERGIZE WITHOUT APPROVAL 5) OK TO TAP TO DISCONNECTS AND LOCK OUT |
|
| 06/12/2007 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. FINISH ALL LOW VOLTAGE WIRING 2. SECURE ALL FIXTURES TO GRID - NEC 300.11 3. REMOVE TEMP WIRING 4. SEAL UNUSED RACEWAY OPENINGS - NEC 110 5. SUPPORT WIRES TO BE CONNECTED @ BOTH ENDS - NEC 300.11 6. M/C TO BE PROPERLY SECURED/SUPPORTED - NEC 330.30 NOTE: NONE OF THE PRIOR INSPECTIONS INCLUDE RADIOLOGY ROOM |