Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - PRE SLAB
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2007 | PLUMBING - PRE SLAB | Approved | IVRS - Inspection :* | |
| 03/13/2007 | PLUMBING - PRE SLAB | Partial Approval | IVRS - Inspection :* | |
| 03/09/2007 | PLUMBING - PRE SLAB | Not ready for Inspection | IVRS - Inspection :* 1. SHALL CORRECTLY INSTALL WASTE & VENT PER PLAN 2. HORIZONTAL VENTING BELOW FLOOD RIM OF FIXTURES REQUIRE VENT TO BE TAKEN OFF DRAIN AT CONTROLLING OF DRAIN. NOTE: MINIMUM 45 DEG. 3. PROVIDE REDLINE ON SITE 4. PROVIDE TEST ON SYSTEM WITH DRY MATERIAL AS SHADING ON ALL PIPING |