Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/19/2010 |
ENGINEERING - FINAL |
|
Approved |
All items complete, approved |
| 04/23/2009 |
ENGINEERING - FINAL |
|
Partial Approval |
THE SITE HAS BEEN CHECKED AND FOUND APPROVABLE FOR A TEMPORARY C OF O AT THIS TIME. THE FINAL C OF O WILL NOT BE GRANTED UNTIL ALL OF THE WORK ADJACENT TO THIS SITE IS COMPLETE AND ACCEPTED. IT HAS ALSO BEEN NOTED THAT THIS SITE HAS ISSUES WITH THE HEIGHTS OF THE LUMINARE POST AND ALSO AN ISSUE WITH NON-PERMITTED SIGNS ON SITE. THESE ISSUES NEED TO BE ADDRESSED AND CLEARED PRIOR TO THE REQUEST FOR THE FINAL C OF O INSPECTIONS FOR ALL BUILDINGS ON THIS SITE. |