Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* USE SWEEPS AT VERTICAL TO HORIZONTAL CHANGE OF DIRECTION. INSTALL CLEANOUT TEST ALL PIPING TO TIE IN POINT NO FERNCO COUPLING USE MISSION BANDS SEE PREVIOUS NOTES. |
|
| 12/19/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. BELOW GRADE BUILDING SEWER SHALL HAVE 12" OF COVER 2. TRACER WIRE IS REQUIRED OUTSIDE. 3. 10' HEAD TEST ON ALL DRAIN & VENT PIPING REQUIRED PROPER DRAINAGE FITTINGS REQUIRED PIPING NOT SIZED PER PLAN 4. MINIMUM TRAP ARM DISTANCE IS 4" 5. VENT SHALL BE PROPERLY SUPPORTED AND SLOPED 6. WATER PIPING SHALL BE PROPERLY SUPPORTED 7. PROPER TRANSITION COUPLINGS AT C1 TO PL |