Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/31/2008 | ROOF NAILING | Approved | IVRS - Inspection :* 1) NOTE: NEED BLOCKS FOR DRYWALL NAILING AT TOP OF WALLS 2) FINISH OSB AT PARAPETS FOR FLASHING BACKING 3) AT TWO P.A.'S AT GARAGE PUT OSB ON FIRST NEXT TIME, NAIL OSB TO ALL STUDS IN THAT WING WALL, THEN NAIL ALL STUDS TOGETHER VERTICALLY |