Inspection History: REINFORCED MASONRY PRE-GROUT

Permit Number - T06CM06275

Inspection Description - REINFORCED MASONRY PRE-GROUT

Inspection Status - Approved

Date Description Inspector Results Comments
04/03/2008 REINFORCED MASONRY PRE-GROUT Approved IVRS - Inspection :*
02/06/2008 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
SITE WALL & REMAINING STEM
12/20/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TOP EAST 8' N.W
12/14/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1ST LIFT SCREEN WALL EAST STEM WALL N & WEST
12/11/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
E. SECURITY STEM & WALL
10/09/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK ALL INTERIOR & 6'-8' OF SCREEN WALL
10/03/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. SITE WALL (32"); STEP WALLS;
SCREEN WALL @ EAST & DOWELS TO LOADING RAMP
2. ALL INFILL PROGRESS OK
3. FOOTINGS @ SW CORNER FOR SWITCHGEAR OK
10/01/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS OK
09/26/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
PROGRESS ON MASONRY OK
09/25/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS OK
09/20/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1) ALL MASONRY PROGRESS OK
09/17/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
09/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL MASONRY PROGRESS VARIOUS AREAS OK
09/12/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS @ VARIOUS AREAS OK
09/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS OK
08/31/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
PROGRESS OK
08/28/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
4' EAST INFILL LINES ARE J, K, L
TOP 4-5/H-N;
8' M/4-5
8' E @ TELECOM
4' HIGH SECURITY LINE 3.5
7'4" 3/A
4' LINE 3.7 @ PUB LOBBY
08/24/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
4' VARIOUS AREAS
16' JANITOR STORAGE
08/22/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
ALL PROGRESS AS NOTED ON SP. INSP. REPORT OK
08/17/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TOP A-E/2.7-3.5 (AREA A-B OK WHEN SP. INSP. CONFIRMS)
08/15/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
OK TO GROUT WHEN SP. INSP. CONFIRMS REBAR PLACEMENT
08/13/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
12' LIFT
GRIDLINE A-E
LINE 2.7-3.5
08/09/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
G.L
H 3.4-4.5
12' - 16'

LINE J-K
0"-4"
08/06/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
3RD LIFT
G.L H-J 4- 4.5
08/03/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
TOPOUT G.L G5-D-LINE 3
08/02/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
07/31/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
16' A.F.F.E AS FOLLOWED BY GRIDLINE 2.2/E.2-G
2.5/G-H.4
07/30/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
STEM WALL FOR VIEWING ROOM 108, ALSO, STEMWALL ON RAISER AREA AS FOLLOWS 3/A-A.5, TOP OF WALL (TOPOUT)
AS FOLLOWS 4/H.5-N
12' A.F.F.E ON FOLLOW 2/E.2-H.4
07/26/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS BY GRIDLINE 8'-9'4" A.F.F.E THE FOLLOWING C.2/E.2-G, G/2.2-2.5, 2.5/G-H.4
ALSO, 4' A.F.F THE FOLLOWING SECURE STORAGE
07/25/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THE FOLLOWING BY GRIDLINE 2.6/G-H.4
OPENING JAMBS 4'-8' A.F.F.E
G/2.6-2.1
07/24/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
NOTE: THIS INSPECTION COVERS 4'-8' A.F.F.E ON THE FOLLOWING 2.2/E.2-E.8
4' A.F.F.E ON THE FOLLOWING 4.5/H.1-H.5, H.5/4.2-4.5
12'-16' A.F.F.E THE FOLLOWING 4/H.8-N
07/20/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
4/H.5-N
8'-12' A.F.F.E IN COMPLIANCE WITH LAYOUT S2.1
S3.1, S1.3, S0.1, S1.1, S1.2 --- OK TO GROUT
07/18/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS THE FOLLOWING BY GRIDLINE
E.2/1.2-2.2 & 1.2/E.2-E.8 TOPOUT
ALSO, 4/H.5-N 8' A.F.F.E; H.1/4.5-5, H.5/H-E.8 4' A.F.F.E (TOPOUT)
IN COMPLIANCE WITH LAYOUT S2.1, S3.1, S1.3, S0.1, S1.1, S1.2
07/16/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVER THE FOLLOWING BY GRIDLINE
E.2/1.2-2.2, 1.2/E.2 - E.8
16' A.F.F.E
07/12/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
INSPECTED BY GRIDLINE AS FOLLOWING E.2/1.2-2.2 -12' A.F.F.E
TOP OUT THE FOLLOWING 1.2/E.8-H.4, H.4/1.2-2.6
F.8/1.2-2.2
TOP OUT ABOVE LINTEL
IN COMPLIANCE WITH SCHEDULE ON S1.3 FOR BOND BEAM
07/10/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
INSPECTED BY GRIDLINE E.2/1.2 - 2.2 = 8' A.F.F.E
1.2/E.2 - E.8 = 8' A.F.F.E
16' A.F.F.E THE FOLLOWING 1.2/E.8 - H.4, H.4/1.2 - 2.6
6 COURSES ABOVE OPENING/LINTEL, MUST REQ. INSPECTION TO TOPOUT ALL ABOVE IN COMPLIANCE WITH LAYOUT S2.1 AND SPECIFIC DETAILS AND GENERAL NOTES
07/06/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS 8'0"-12'0" A.F.F.E ON THE FOLLOWING 1.2/E.8-H.4/1.2-2.5; E8/1.2-7.2 OK TO GROUT
07/05/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
1. 1ST LIFT TO 4FEET CMU WALL GRID D-1 TO 2.5 & 1 - D TO E
2. 1ST LIFT TO 4FEET CMU WALL GRID 3.5 A TO C -- C 3.5 TO 2.5
STEM WALL @ GRID 4.5 FROM E TO G
07/02/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS TOPOUT WALL ON GRIDLINE A/5-8
ALSO, 4'0" A.F.F.E ON THE FOLLOWING E.2/22-1.2, 1.2/E.2-E.8
4'0" - 8'0" A.F.F.E ON THE FOLLOWING 1.2/E.8-H.4, H.4/1.2-2.5
E8/1.2-2.2
06/28/2007 REINFORCED MASONRY PRE-GROUT Cancelled
06/27/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS THE FOLLOWING BY GRIDLINE
4'0" A.F.F.E
E.8/1.2-2.2, 1/E.6-H.4, H.4/1.2-2.5 CMU WALL OK TO POUR
06/20/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS STEM/FIRST BOND BEAM AT BOTTOM OF WALL IN THE FOLLOWING AREAS 130, 129/127 NEED TO COMPLETE OPENING ON EAST INCL. CORNERS IN CONNECTION WITH NORTH AND SOUTH WALLS.
06/11/2007 REINFORCED MASONRY PRE-GROUT Partial Approval IVRS - Inspection :*
THIS INSPECTION COVERS AS PER PLAN LAYOUT SHEET A2.2 GRIDLINE 1/E, F H IN ACCORDANCE WITH APPROVED PLANS AND SPECIFIC DETAIL ON SHEET S3.1/106 DETAIL

OTHERS MUST PROVIDE INSPECTION PRIOR TO COVERING OR CONCEALING WORK, PROVIDE SPECIAL INSPECTOR REPORT IN COMPLIANCE FOR EAST INFILL OPENINGS.