Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
Permit Number - T06CM06275
Inspection Description - EXCAVATION/LAYOUT REBAR & ZON
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/03/2008 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
01/09/2008 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* LIGHT POLE BASES (5 EACH) EAST OK SIDEWALK ALONG DOCK OK |
|
12/04/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* PARTIAL PER SPECIAL INSPECTION EAST ELEVATION SEE WALL |
|
09/25/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* ALL BUT 8/E-E.1 RAMP |
|
09/20/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
08/17/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1. LINE A/4-4.5 PER DETAIL 118 RFI 46 |
|
08/09/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1 FOOTER LINE A.5 |
|
07/31/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
07/30/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* OK TO POUR CONCRETE ON THE FOLLOWING PARTIAL APPROVAL AS FOLLOWS 4.5/A5-6 INCLUDED COLUMNS F1 ALSO, CONT. FOUNDATION ON SQUARE 4-5/D-F |
|
07/27/2007 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* INCOMPLETE WORK, SETUP ALL REINFORCING COLUMNS AND CONT. FOUNDATION CONNECTIONS, PROVIDE PROPER CLEARANCES BETWEEN SOIL/EARTH AND REINFORCING |
|
07/26/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
07/25/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
07/16/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
07/13/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING FOR VIEWING ROOM (CONT. FOUNDATION) GRIDLINE 3.6/A.8-B.8 2C1/F1 COLUMNS IN COMPLIANCE WITH SPECIFIC DETAIL S1.3, LAYOUT S2.1 |
|
07/11/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
07/09/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* FOOTING FOR UPSTAIRS, FOOTING ON GRIDLINE 3.1/A-A.1 FOR FIRE RISER ENCLOSURE IN ACCORDANCE WITH LAYOUT S2.1, S3.1 |
|
07/06/2007 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | ||
07/05/2007 | EXCAVATION/LAYOUT REBAR & ZON | Not ready for Inspection | IVRS - Inspection :* | |
07/03/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* THIS INSPECTION COVERS THE FOLLOWING BY GRID LINE 4.5/E.2/H.1 IN COMPLIANCE WITH REINFORCING AND SPECIFIC DETAIL 102 ON SHEET S3.1 LAYOUT S2.1 |
|
07/02/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* THIS INSPECTION COVERS FOOTING 102 DETAIL, GRIDLINE 4/L.2-N |
|
06/28/2007 | EXCAVATION/LAYOUT REBAR & ZON | Cancelled | ||
06/27/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* THIS INSPECTION COVERS THE FOLLOWING BY GRIDLINE 4/L - H.5, 4.5/H.5-H.2, H.2/4.5-5 MUST PROVIDE SPECIAL INSPECTION REPORT FOR EPOXY CONNECTIONS. |
|
06/25/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* NOTE: THIS INSPECTION COVERS FOOTINGS FOR STORAGE 120, 119, 127 IN COMPLIANCE WITH RFI/SK1 12/15/06 HIGH DENSITY STORAGE FOOTING |
|
06/22/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* THIS INSPECTION COVERS FROM A7 TO A8 FOOTING REQUIREMENTS IN ACCORDANCE W/RFI #46 -- DETAIL 118/S3.2 |
|
06/21/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* THIS INSPECTION COVERS THE FOLLOWING BY GRIDLINE A/6-7 FOOTINGS REQUIREMENTS IN ACCORDANCE WITH RFI #46 DETAIL 118/S3.2 |
|
06/20/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* GRIDLINE 3/A.2-B.5, A.2/3.2-2.8, 2.8/A-A.2, D.8/3.6-4 |
|
06/15/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* 1) CONTROL JOINS PER GSN SO. 1, THIS INSPECTION COVER THE FOLLOWING AREAS SECURED STORAGE 130, 129 AND 127 NEED TO COMPLETE OPENING ON EAST INCL. CORNERS IN CONNECTION WITH NORTH AND SOUTH WALLS/FOOTINGS. ALSO GIRDLINE 3/B.5-C.2, C.2/2.8-3.2, 28/C.2-C.6, C.6/28-3 |
|
06/01/2007 | EXCAVATION/LAYOUT REBAR & ZON | Partial Approval | IVRS - Inspection :* THIS INSPECTION COVERS THE FOLLOWING AREAS AS PER PLAN 123, 124 KEY FLOOR PLAN SHEET A2.0, LAYOUT AND INFORMATION ON SHEET S2.1 4" CONCRETE OVER 4" INS. 4" CONCRETE SLAB OVER 4" A.B.C FILL -- SPECIFIC DETAIL OR SHEET S3.2/115 DO NOT INCLUDE FOOTINGS F2 10 X 2' X 2' W/3 #4 E.W C8 SCHEDULE |