Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2009 | ENGINEERING - FINAL | Approved | ||
| 06/20/2008 | ENGINEERING - FINAL | Partial Approval | Contractor needs to: 1- Complete trash enclosure. (all) 2- Clean parking lot. 3- Fill all open holes. 4- Install grate for catch basin. 5- Clean all construction debris. 6- Complete sidewalk eastside of building. All site work must be completed before final C of O. |