Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
Permit Number - T06CM06128
Inspection Description - BUILDING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/26/2007 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
02/09/2007 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PAY REINSPECTION FEE @ 201 N. STONE 1. MAKE ALL CORRECTIONS. 2. FIX BACKPITCH ON LAV DRAIN |
|
02/07/2007 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) MAKE ALL CORRECTIONS NOTED ON PREVIOUS VISITS |
|
02/05/2007 | BUILDING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) SPLIT FRONT TOILET SEAT REQUIRED IN RESTROOMS 2) ACCESSIBLE WATER CLOSET MUST HAVE FLUSH HANDLE ON WIDE SIDE OF ROOM 3) REPAIR WALL BEHIND TANK |
|
01/18/2007 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* AFTER SCHEDULE INSPECTION CHECK NO. 1200 AMT. $108.00 RECEIVED 1/17/07 1. PROVIDE CORRECTION LEFT ON 12/2/06 2. SOLID GROUT REQ. FOR 3 HOUR MASONRY WALL 3. SAME CORRECTIONS LEFT FOR SUITE 100 |
|
12/21/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. 12" ADDRESS DISPLAY REQUIRED 2. 3" SUITE # REQUIRED 3. SEE NOTES FOR SUITE #100 4. SOLID GROUT REQUIRED FOR 3 HOUR MASONRY WALL WHOEVER BUILT THIS NEEDS TO CALL ME 5. PROVIDE ACCESS INTO SUITE |