Permit: T06CM06128

Parcel: 129041830

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T06CM06128

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
02/26/2007 BUILDING - FINAL Approved IVRS - Inspection :*
02/09/2007 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
PAY REINSPECTION FEE @ 201 N. STONE
1. MAKE ALL CORRECTIONS.
2. FIX BACKPITCH ON LAV DRAIN
02/07/2007 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) MAKE ALL CORRECTIONS NOTED ON PREVIOUS VISITS
02/05/2007 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) SPLIT FRONT TOILET SEAT REQUIRED IN RESTROOMS
2) ACCESSIBLE WATER CLOSET MUST HAVE FLUSH HANDLE ON WIDE SIDE OF ROOM
3) REPAIR WALL BEHIND TANK
01/18/2007 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
AFTER SCHEDULE INSPECTION CHECK NO. 1200 AMT. $108.00
RECEIVED 1/17/07

1. PROVIDE CORRECTION LEFT ON 12/2/06
2. SOLID GROUT REQ. FOR 3 HOUR MASONRY WALL
3. SAME CORRECTIONS LEFT FOR SUITE 100
12/21/2006 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. 12" ADDRESS DISPLAY REQUIRED
2. 3" SUITE # REQUIRED
3. SEE NOTES FOR SUITE #100
4. SOLID GROUT REQUIRED FOR 3 HOUR MASONRY WALL WHOEVER BUILT THIS NEEDS TO CALL ME
5. PROVIDE ACCESS INTO SUITE