Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2007 | ENGINEERING - FINAL | Approved | ||
| 07/13/2007 | ENGINEERING - FINAL | Denied | NOT READY 1. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. 2. PROVIDE POSITIVE DRAINAGE ON NORTH SIDE OF SITE FOR ROOF DRAINAGE. 3. PROVIDE CONCRETE WHEEL STOPS FOR PARKING SPACES ON WEST SIDE OF BUILDING. 4. CORRECT PONDING WATER IN PARKING SPACES ON SOUTH SIDE OF BUILDING. |